Day five and it is all happening
Today we have had the delivery of all of our dental units and worktops.
Add to that the electrician Ross from DSB Maintenance.co.uk who has re-wired the room ready for the installation of the dental units.
The plaster has nearly dried and a team will be in painting the walls this evening.
As you can see from the video the wiring has been completed for the installation of the new dental chair which will be fitted tomorrow.
Take a look back over the last four days to see the transformation:
- Time for a change at SpaDental Plymouth
- What a difference a day makes: Day two of the SpaDental Plymouth surgery refit
- Day three of the Surgery One refurbishment at Plymouth